Some of our current and completed synthetic turf pitches, multi use games areas and tennis courts are listed below.
The current projects are updated regularly with diary entries, so you can follow the construction process from start to finish.
We have worked over the Christmas Holidays to provide a new sand dressed, artificial turf, multi sport area for Elstree School in Berkshire.
Ballard School are now the proud owners of a quality sand dressed hockey pitch, 3 hard tennis courts and a two lane artificial grass cricket practice nets. Completed in just 12 weeks, click here to see how we did it.
We are building a multi sports facility at Beechen Cliff School in Bath, comprising of a sand dressed hockey pitch and a 3rd generation 5-a-side pitch with fencing and floodlighting.
Verde Recreo are providing the outdoor sports facilities at the new Arts Centre at Hayesfield School in Bath. The sand filled artificial grass MUGA and tarmac netball courts are due for completion by the end of April.
We are working again with Bam Construction at Filton High School. The old school buildings have been demolished and we will be constructing a 102m x 65m artificial grass pitch.
We are working with Bam Construction at Chilton Trinity Technology College in Bridgwater, constructing a hard play area suitable for tennis, netball, basketball and football.
Continuing our relationship with Bam Construction, we are building a 3G football pitch at Robert Blake & Elmwood School in Bridgwater. The project is in two phases, with the second phase to begin in 2013.
With the school set in 200 acres of park land, Verde Recreo have greatly enjoyed working for Hazlegrove Preparatory School in Somerset. The project comprised of the re-surfacing of an existing red-gra court to provide a new artificial turf hockey practice pitch, alongside a multi use tarmac court for tennis and netball.
Verde Recreo have completed another sports pitch for Somerset County Council at Oakfield School in Frome. The project comprised of a 40m x 36m acrylic sprayed macadam MUGA. The courts are fenced with a twinbar system and marked out for tennis, netball, basketball and football
We have replaced the worn out hockey pitch at King's School in Bruton with a state of the art, sand filled, mono filament hockey carpet. This is the first time this carpet has been laid worldwide. The project was completed in September 2010.
Bristol University will soon have a new state of the art, artifcial turf hockey pitch. Verde Recreo have won the contract to remove the worn out water based pitch at the Coombe Dingle and install a high spec sand filled synthetic turf.
As part of the re-building of Nailsea School, Verde Recreo have been asked to provide a 106m x 71m artificial pitch. Working for Carillion, in partnership with North Somerset Council, we will be installing a 3G surface, tested for both football and hockey use.
Verde Recreo have started building the artificial turf pitch for the MOD in Corsham, near Bath. We are excited to be working for Laing O'Rourke who are the main contractor on this large capital project. The pitch is 97.4m x 63m and will be surfaced with a 24mm sand filled grass.
Verde Recreo are installing a 40m x 40m, 3rd generation football training pitch, for Yatton Junior Football Club. The project includes a twinbar perimeter fence, floodlighting and upgrading works to the car park.
Verde Recreo have commenced work at Filton High School. The school is being entirely re-built and we have been asked to provide a 77m x 37m porous macadam MUGA, for tennis, netball and basketball use.
We are delighted to announce that we have completed the new sand dressed hockey pitches for Monkton Prep School in Bath. This long awaited facility, comprising of over 9000m2 of artificial grass, was completed in 16 weeks and is ready to be enjoyed at the start of the new term.
Working for Somerset County Council Verde Recreo have constructed a new multi sports facility incorporating 2 MUGAS, a sand filled ATP, a polymeric sprint straight and 4 macadam tennis courts.
The construction of a multi sports facility incorporating 4 new Category 4 Netball courts and a 3rd generation football pitch all with fencing and floodlighting, along with a 1000m2 semi permanent sports hall with polyurethane sports flooring.
The construction of a 60m x 35m sand filled artificial grass multi use games area, incorporating drainage, rebound fencing and access paths
Verde Recreo have completed the contract to upgrade the existing MUGA at the Usk Campus of Coleg Gwent.